
The electric pipe clamp valve, designed with leak free hose compression, performs excellently in environments with strong corrosion, high wear, and strict hygiene requirements.
1. Sealing reliability
Leak free sealing: relying on the complete flattening of the hose, no additional sealing components are required to avoid traditional valve packing leakage problems.
2. Intelligent control of electric actuator:
Built in PID algorithm, supporting flow closed-loop control; Overload protection: Real time monitoring by torque sensor, automatic shutdown when exceeding the limit.
4. Special design optimization
Explosion proof design: Explosion proof actuator (Ex d), valve body grounded to prevent static electricity accumulation.
5. High/Low Temperature Adaptation:
High temperature type: using heat-resistant silicone hose and actuator heat sink;
Low temperature type: the Material of the hose is low temperature EPDM, and the actuator is powered with heat tracing.
Product Features
Leak free design: By squeezing the hose to completely cut off the medium, the valve body has no dynamic sealing point, eliminating the risk of external leakage.
Strong corrosion resistance: The hose Material can be rubber, fluoroplastic, etc. It is suitable for strong acid, strong alkali, and organic solvents.
Wear resistant and particle resistant: The hose can withstand high solid content slurries (such as slurry, mud) to avoid valve blockage.
Sanitary compatibility: No dead corner structure, suitable for sterile fluids (food, pharmaceutical), supports CIP/SIP cleaning.
Automated control: The electric actuator accurately adjusts the opening and supports the integration of 4-20mA, Modbus and other signals into the DCS/PLC system.
Applicable working conditions
Electric pipe clamp valves are irreplaceable in the following scenarios due to their characteristics of no leakage, corrosion resistance, and wear resistance:
1. Strong corrosive media (acid, alkali, solvent);
2. Slurry containing solid particles (slurry, sludge);
3. Sanitary/sterile fluids (food, biologics);
4. Complex pipelines that require automated control.
Product Features
DN15-DN200
Size
PN10、PN16、PN25、PN40
Pressure
WCB, A105, CF8, CF8M, CF3, CF3M, 2205, 2507
Material
Flanges, Clamps, Threads, Plug-in Connections (direct Hose Connections)
Connection Method
Design And Manufacturing Standard GB/T 12234, Structural Length Standard GB/T12221
Design Standards
GB/T 26480
Testing Standards
-200℃~200℃
Temperature
.png)
Wenzhou Seminar Jointly Seeks New Strategies For Improving Valve Quality
Recently, the Valve Quality Improvement Seminar hosted by the Construction Project Management Branch of the National Pipeline Network Group was successfully held in Wenzhou.

Dangba Lithium Mine Has Exceeded One Million Tons, Becoming The Largest Deposit Of Its Kind In Asia!
Recently, the Dangba Lithium Mine in Malkang City, Aba Prefecture, Sichuan Province, has passed the mineral resource reserve review and filing by the Ministry of Natural Resources. It has added 440000 tons of lithium oxide resources and identified a total of 1.1207 million tons of lithium oxide resources, becoming the first granite pegmatite lithium deposit in Sichuan Province with lithium oxide resources exceeding one million tons. It is also the largest granite pegmatite lithium deposit in Asia with proven resources to date.
secure
green
quick
Efficient

Iran International Petroleum Exhibition 2025: Global Oil And Gas Industry Summit Is About To Kick Off
As one of the most influential energy industry events in the Middle East, the 30th Iran International Oil, Gas and Petrochemicals Exhibition (IOG 2025) will be held at the Tehran International Exhibition Center from X to X, 2025. The theme of this exhibition is "Sustainable Energy Transformation and Technological Innovation", and it is expected to attract more than 2000 exhibiting companies and 50000 professional visitors from over 50 countries around the world to explore new technologies, markets, and investment cooperation opportunities in the oil and gas industry.

Accurate Installation Of Computer Prototype Valve For Dongzhuang Water Conservancy Hub Project Completed
Today, with the completion of the debugging of the last intelligent CNC valve, a breakthrough has been made in the installation of core equipment for the national major water conservancy project - Dongzhuang Water Conservancy Hub Project. This project adopts the independently developed "computer prototype intelligent valve control system" for the first time, and its precise installation marks that China's high head and large flow water conservancy hub equipment technology has entered the international leading ranks.